Method Statement For Air Conditioning Pipe Insulation Works

 Content:

1. Chiller water pipes.

2. Condensate water pipes.

3. Refrigerant pipes.

4. Air conditioning drain pipes.

5. Valves & fittings.

General:

Items: - The Method Statement For Air Conditioning Pipe Insulation Works

Aim:

The aim of works is to describe mechanical works associated with insulation of

Chiller pipe, A/C drain pipe & Refrigerant pipe (copper pipe) to ensure compliance

with contract requirements approved shop drawings, materials, specification and

quality control.


Post a Comment

0 Comments